Measure energy consistently. Build carbon disclosure from verified operating data.
YDNRESIN identifies purchased electricity and steam as important manufacturing energy inputs. The 2025 Annual Report does not publish quantified Scope 1 or Scope 2 greenhouse-gas emissions, so this page does not present an estimated carbon footprint as a public disclosure.
Formal Scope 1 and Scope 2 accounting will be published only after site-level activity data, boundaries and emission factors are verified.
Purchased electricity and steam are important manufacturing energy inputs identified in the company’s operating disclosures.
No major environmental violations were reported for 2025.
No major production safety accidents were reported for 2025.
Separate verified operating facts from future carbon metrics.
Until a formal greenhouse-gas inventory is completed, YDNRESIN will avoid publishing estimated tCO₂e figures as if they were verified emissions. Future disclosure should state the reporting boundary, activity data, emission factors, methodology and review status.
Current manufacturing scale
The 2025 Annual Report states a 15,000 t/y design capacity for modified melamine resin and 95% utilization during the reporting period.
Energy data
Track metered electricity, purchased steam and other site utilities by reporting period and major production area.
Scope 1 boundary
Collect site-level data for direct fuel use, refrigerants and other applicable direct greenhouse-gas sources before calculating Scope 1 emissions.
Scope 2 boundary
Calculate purchased-energy emissions using documented electricity and steam data together with appropriate, traceable emission factors.
Connect efficiency projects with measured operating data.
Priority opportunities can include steam-system efficiency, batch heating and cooling optimization, motor and pump efficiency, insulation, heat recovery, leakage reduction and production scheduling. Project benefits should be quantified from measured before-and-after data wherever practicable.
- 01MeasureTrack electricity, steam and process-energy intensity by production period and major equipment group.
- 02NormalizeRelate energy use to production volume and relevant process conditions so year-to-year comparisons are meaningful.
- 03ImprovePrioritize utility, equipment and process projects using measured energy and operating data.
- 04Verify & DisclosePublish Scope 1/2 totals and intensity metrics only after boundaries, methodology and source data are documented.
Use verified numbers when numbers are published.
YDNRESIN’s sustainability pages distinguish reported operating controls from metrics that are still being established. Customer carbon declarations, product carbon footprints and regulatory reporting require their own defined methodology and verified data.